When using the "Auto Residual Sheet" feature on a Job Item, PrintVis will automatically split the sheet into the required number of sheets based on the same imposition.
To avoid calculating excessive make-ready time for residual sheets, it is advised to:
- Set Up a Subsequent List of Units:
-
Create a new List of Units specifically for residual sheets that does not include a complete make-ready operation.
-
Configure the Calculation Unit for Residual Sheets:
- Ensure that the List of Units selected for residual sheets is different from the main production List of Units.
- The new List of Units should contain a Price Unit for the printing machine with a lower calculation (or no calculation) of make-ready time.
Auto Residual Sheet Setting: - Products: 3 different 4-page folders.
Calculation Units List: - Select the appropriate List of Units for Residual Sheets from the marked field.
Default Setting: - The default field value is set to its own code, which may include excessive make-ready time.
Adjustments: - Change the List of Units to avoid double make-ready time. - Ensure that the new List of Units has a lower or no make-ready calculation.